
|
INFORMATION |

|
Copyright ABC Limited 2009 Designed by Jade Allingham |
|
Atlas Bulk Carriers Limited |




|
CONGESTION CHARGE |



|
Depth 0.5m |
|
Width 4m |
|
Length 3m |
|
NOTE: When calculating volume to be removed, you have to allow for ‘bulking factor’. This can vary considerably e.g. clay has a higher bulking factor compared to sand. As well as calculating volume to be removed, you need to consider the carrying capacity of our vehicles. Some materials being delivered can be much heavier than others. |
|
Environment Agency Congestion charging www.tfl.gov.uk/roadusers/congestioncharging/ Low Emission Zone (LEZ) www.tfl.gov.uk/roadusers/lez/default.aspx Freight Transport Association Epic
|
|
When working in the London area you may find the link below to the London congestion charge website helpful. |
|
Please notify our transport department if this applies to your site when requesting a quotation. |